1. Purpose
Section titled “1. Purpose”The operator’s end-to-end procedure for upgrading a running Wovyr deployment from one released version to the next (RM-AIM-P3 DEP-302): back up, swap the binary, run schema migrations, verify, and — if needed — roll back. Variants for the three supported deployment shapes: systemd (systemd.md), Compose (docker-compose.md), and Helm (helm.md).
2. What an upgrade touches
Section titled “2. What an upgrade touches”| Surface | Mechanism | Version coupling |
|---|---|---|
The wovyr binary (server + CLI are one binary) | Replace and restart | Release tags; see CHANGELOG.md |
~/.wovyr durable state (auth, secrets, KMS, workflows, webhooks, tenancy, audit, …) | Carried forward in place; no migration step — on-disk formats are versioned and fail closed on skew | Wrapped payloads (workflow events, UI frames) reject newer-than-understood versions, so never run an older binary against state a newer binary wrote (see §7) |
| Postgres schemas (workflow, memory, marketplace — only if you opted into these backends) | wovyr admin migrate, the only thing that ever runs DDL | connect reads the schema version and fails closed on any mismatch — an un-migrated binary refuses to start serving that backend, and an old binary refuses a newer schema |
SDKs (@wovyr/sdk, wovyr-sdk) | Client-side upgrade, out of band | Same major.minor as the platform = same API; health() warns once per client on skew |
Startup after any restart is self-healing by design: in-flight durable workflow
executions are resumed, the webhook outbox re-dispatches pending deliveries, and
interrupted bare async agent runs (not resumable by design) are reconciled to
Failed rather than left Running forever.
3. Pre-upgrade checklist
Section titled “3. Pre-upgrade checklist”- Read the release notes for every version between yours and the target
(
CHANGELOG.mdon the GitHub release). Pre-GA, breaking wire/on-disk changes are permitted and called out there. - Confirm your KMS root key is escrowed (
WOVYR_KMS_ROOT_KEY, or the generate-once~/.wovyr/kms/root.key). A backup without it does not restore secrets/encrypted memory — see backup-and-restore.md §3. - Note which Postgres-backed features you use (
--target workflow,memory,marketplace) — each has its own schema and its own migrate call. - Plan the window. The server drains gracefully on SIGTERM
(
WOVYR_SHUTDOWN_GRACE_SECS, default 30s), so expect up to that long between “stop” and “stopped”. Single-node deployments have no rolling path — this is a brief hard outage; suspended workflows and queued webhooks resume on start.
4. The upgrade, end to end
Section titled “4. The upgrade, end to end”The same five steps in every deployment shape; §5 gives the shape-specific commands for steps 2–4.
Step 1 — Backup. With the old binary, while the server is still running
(backup quiesces writers via the shared ~/.wovyr file locks — no stop needed):
wovyr admin backup /var/backups/wovyr/pre-$(date +%Y%m%d) # or s3://bucket/prefixIf you use Postgres backends, also snapshot the database with your normal tooling
(pg_dump/provider snapshot) — wovyr admin backup covers ~/.wovyr only.
Step 2 — Stop the old server. SIGTERM and wait for the drain (§5 per shape).
Step 3 — Swap the binary/image (§5 per shape).
Step 4 — Migrate each Postgres schema you use — before starting the new server, once per schema, from any host that can reach the database:
wovyr admin migrate --target workflow --database-url "$WOVYR_PG_URL"wovyr admin migrate --target memory --database-url "$WOVYR_MEMORY_POSTGRES_URL"wovyr admin migrate --target marketplace --database-url "$WOVYR_MARKETPLACE_POSTGRES_URL"Migrations are versioned (refinery), forward-only, and idempotent — re-running
against an already-migrated schema is a no-op. Skipping this step is safe-but-
loud: the new binary’s connect fails closed with a clear version-mismatch error
rather than limping on a schema it doesn’t match. There is no auto-migrate on
startup, deliberately.
Step 5 — Start and verify (§6).
5. Per-shape commands (steps 2–4)
Section titled “5. Per-shape commands (steps 2–4)”systemd (bare-metal appliance)
Section titled “systemd (bare-metal appliance)”sudo systemctl stop wovyr # SIGTERM + drainsudo ./deployment/install.sh --binary ./wovyr # idempotent: replaces /usr/local/bin/wovyr, # never clobbers /etc/wovyr/wovyr.env# step 4 migrations here (run as the wovyr user if the DB URL lives in wovyr.env:# sudo -u wovyr env $(grep -v '^#' /etc/wovyr/wovyr.env | xargs) wovyr admin migrate ...)sudo systemctl start wovyrinstall.sh is CI-tested to preserve an existing /etc/wovyr/wovyr.env — operator
config survives the upgrade. If you don’t use install.sh, replace
/usr/local/bin/wovyr by hand and systemctl start wovyr.
Compose
Section titled “Compose”docker compose -f deployment/docker-compose.yml stop wovyr # drains via SIGTERM# bump the wovyr image tag in docker-compose.yml (or your override file)docker compose -f deployment/docker-compose.yml pull wovyr# step 4 migrations, e.g. through the new image against the compose network:docker compose -f deployment/docker-compose.yml run --rm wovyr \ admin migrate --target workflow --database-url "$WOVYR_PG_URL"docker compose -f deployment/docker-compose.yml up -d wovyr# step 4 first (kubectl run a one-off pod with the new image, or port-forward# Postgres and run migrate from a workstation), then:helm upgrade wovyr deployment/helm/wovyr --reuse-values \ --set wovyr.image.tag=<new-version>kubectl rollout status statefulset/wovyrThe chart is a single-replica StatefulSet over a PVC — helm upgrade recreates
the one pod (brief outage, same as the other shapes), and ~/.wovyr rides the
PVC through it.
6. Post-upgrade verification
Section titled “6. Post-upgrade verification”# 1. The process is up and reports the new version:curl -fsS http://127.0.0.1:8080/healthz # {"status":"ok","version":"<new>"}# 2. Metrics scrape works and the operability gauges recomputed from the stores:curl -fsS http://127.0.0.1:8080/metrics | grep -E "wovyr_(workflow_executions_active|webhook_outbox_pending)"# 3. Postgres-backed features actually connect (fails closed if a migrate was missed):wovyr workflows list --server http://127.0.0.1:8080# 4. A smoke run end to end:wovyr agents run --server http://127.0.0.1:8080 -f examples/agents/hello.yaml --input '{"message":"Hi"}'Then watch the logs for one dispatcher interval (WOVYR_DISPATCH_INTERVAL_SECS,
default 5s) to confirm startup recovery: resumed executions, re-dispatched
webhook deliveries, and any bare runs reconciled to Failed are all logged.
Finally, expect SDK clients on the old major.minor to log a one-time
version-skew warning from health() — upgrade the SDKs at your convenience
(same major.minor = same API).
7. Rollback
Section titled “7. Rollback”Two distinct cases:
The new binary misbehaves but wrote nothing you need to keep (caught in verification): stop it, reinstall the previous binary, and — because on-disk formats fail closed on newer versions — restore the pre-upgrade state rather than pointing the old binary at state the new one may have touched:
wovyr admin restore /var/backups/wovyr/pre-<date> --yes # verifies the sha256 manifest before writingFor Postgres backends, restore the matching database snapshot from step 1.
There is no migrate --down: schema rollback is restore the snapshot, by
design (forward-only migrations keep the version ledger unambiguous).
The new version has been live and accepted real traffic: rolling back means losing the writes since the upgrade (restore = the backup’s contents; RPO is your backup cadence — see backup-and-restore.md §5). Prefer rolling forward to a fixed patch release; treat restore-based rollback as the disaster path.
8. Version-skew rules (summary)
Section titled “8. Version-skew rules (summary)”- Never run an older binary against
~/.wovyrstate or a Postgres schema a newer binary has written/migrated — every versioned surface (workflow event envelopes, UI frame schema, refinery schema versions) rejects newer-than-understood data by design. Rollback = old binary plus restored old state, never old binary alone. - The single binary serves CLI and server, and both share
~/.wovyr— upgrade them as one unit on a host; don’t run a new CLI against an old server’s state directory on the same machine. - SDKs are forward/backward tolerant within the same
major.minor; across minors,health()warns andCHANGELOG.md(per SDK) lists what changed.
9. Related documents
Section titled “9. Related documents”- backup-and-restore.md — what
wovyr admin backup/restorecovers, S3 targets, RPO/RTO, KMS escrow - systemd.md / docker-compose.md / helm.md — the three deployment shapes
- terraform.md — infrastructure provisioning status (spec-only; decision recorded there)
10. Revision History
Section titled “10. Revision History”| Version | Date | Description |
|---|---|---|
| 1.0.0 | 2026-07-18 | RM-AIM-P3 DEP-302: initial end-to-end upgrade/migration runbook (backup → swap → migrate → verify → rollback, per-shape variants) |