Upgrade & Migration Runbook

Document ID: DEP-UPG-001 File Path: docs/12-deployment/upgrade-and-migration.md Version: 1.0.0 Status: Active — every command here exists and is CI-tested; the runbook as a whole has been walked through on a dev host, not yet on a production fleet Owner: Platform Operations Team Last Updated: 2026-07-18


The operator’s end-to-end procedure for upgrading a running Wovyr deployment from one released version to the next (RM-AIM-P3 DEP-302): back up, swap the binary, run schema migrations, verify, and — if needed — roll back. Variants for the three supported deployment shapes: systemd (systemd.md), Compose (docker-compose.md), and Helm (helm.md).


SurfaceMechanismVersion coupling
The wovyr binary (server + CLI are one binary)Replace and restartRelease tags; see CHANGELOG.md
~/.wovyr durable state (auth, secrets, KMS, workflows, webhooks, tenancy, audit, …)Carried forward in place; no migration step — on-disk formats are versioned and fail closed on skewWrapped payloads (workflow events, UI frames) reject newer-than-understood versions, so never run an older binary against state a newer binary wrote (see §7)
Postgres schemas (workflow, memory, marketplace — only if you opted into these backends)wovyr admin migrate, the only thing that ever runs DDLconnect reads the schema version and fails closed on any mismatch — an un-migrated binary refuses to start serving that backend, and an old binary refuses a newer schema
SDKs (@wovyr/sdk, wovyr-sdk)Client-side upgrade, out of bandSame major.minor as the platform = same API; health() warns once per client on skew

Startup after any restart is self-healing by design: in-flight durable workflow executions are resumed, the webhook outbox re-dispatches pending deliveries, and interrupted bare async agent runs (not resumable by design) are reconciled to Failed rather than left Running forever.


  1. Read the release notes for every version between yours and the target (CHANGELOG.md on the GitHub release). Pre-GA, breaking wire/on-disk changes are permitted and called out there.
  2. Confirm your KMS root key is escrowed (WOVYR_KMS_ROOT_KEY, or the generate-once ~/.wovyr/kms/root.key). A backup without it does not restore secrets/encrypted memory — see backup-and-restore.md §3.
  3. Note which Postgres-backed features you use (--target workflow, memory, marketplace) — each has its own schema and its own migrate call.
  4. Plan the window. The server drains gracefully on SIGTERM (WOVYR_SHUTDOWN_GRACE_SECS, default 30s), so expect up to that long between “stop” and “stopped”. Single-node deployments have no rolling path — this is a brief hard outage; suspended workflows and queued webhooks resume on start.

The same five steps in every deployment shape; §5 gives the shape-specific commands for steps 2–4.

Step 1 — Backup. With the old binary, while the server is still running (backup quiesces writers via the shared ~/.wovyr file locks — no stop needed):

Terminal window
wovyr admin backup /var/backups/wovyr/pre-$(date +%Y%m%d) # or s3://bucket/prefix

If you use Postgres backends, also snapshot the database with your normal tooling (pg_dump/provider snapshot) — wovyr admin backup covers ~/.wovyr only.

Step 2 — Stop the old server. SIGTERM and wait for the drain (§5 per shape).

Step 3 — Swap the binary/image (§5 per shape).

Step 4 — Migrate each Postgres schema you usebefore starting the new server, once per schema, from any host that can reach the database:

Terminal window
wovyr admin migrate --target workflow --database-url "$WOVYR_PG_URL"
wovyr admin migrate --target memory --database-url "$WOVYR_MEMORY_POSTGRES_URL"
wovyr admin migrate --target marketplace --database-url "$WOVYR_MARKETPLACE_POSTGRES_URL"

Migrations are versioned (refinery), forward-only, and idempotent — re-running against an already-migrated schema is a no-op. Skipping this step is safe-but- loud: the new binary’s connect fails closed with a clear version-mismatch error rather than limping on a schema it doesn’t match. There is no auto-migrate on startup, deliberately.

Step 5 — Start and verify (§6).


Terminal window
sudo systemctl stop wovyr # SIGTERM + drain
sudo ./deployment/install.sh --binary ./wovyr # idempotent: replaces /usr/local/bin/wovyr,
# never clobbers /etc/wovyr/wovyr.env
# step 4 migrations here (run as the wovyr user if the DB URL lives in wovyr.env:
# sudo -u wovyr env $(grep -v '^#' /etc/wovyr/wovyr.env | xargs) wovyr admin migrate ...)
sudo systemctl start wovyr

install.sh is CI-tested to preserve an existing /etc/wovyr/wovyr.env — operator config survives the upgrade. If you don’t use install.sh, replace /usr/local/bin/wovyr by hand and systemctl start wovyr.

Terminal window
docker compose -f deployment/docker-compose.yml stop wovyr # drains via SIGTERM
# bump the wovyr image tag in docker-compose.yml (or your override file)
docker compose -f deployment/docker-compose.yml pull wovyr
# step 4 migrations, e.g. through the new image against the compose network:
docker compose -f deployment/docker-compose.yml run --rm wovyr \
admin migrate --target workflow --database-url "$WOVYR_PG_URL"
docker compose -f deployment/docker-compose.yml up -d wovyr
Terminal window
# step 4 first (kubectl run a one-off pod with the new image, or port-forward
# Postgres and run migrate from a workstation), then:
helm upgrade wovyr deployment/helm/wovyr --reuse-values \
--set wovyr.image.tag=<new-version>
kubectl rollout status statefulset/wovyr

The chart is a single-replica StatefulSet over a PVC — helm upgrade recreates the one pod (brief outage, same as the other shapes), and ~/.wovyr rides the PVC through it.


Terminal window
# 1. The process is up and reports the new version:
curl -fsS http://127.0.0.1:8080/healthz # {"status":"ok","version":"<new>"}
# 2. Metrics scrape works and the operability gauges recomputed from the stores:
curl -fsS http://127.0.0.1:8080/metrics | grep -E "wovyr_(workflow_executions_active|webhook_outbox_pending)"
# 3. Postgres-backed features actually connect (fails closed if a migrate was missed):
wovyr workflows list --server http://127.0.0.1:8080
# 4. A smoke run end to end:
wovyr agents run --server http://127.0.0.1:8080 -f examples/agents/hello.yaml --input '{"message":"Hi"}'

Then watch the logs for one dispatcher interval (WOVYR_DISPATCH_INTERVAL_SECS, default 5s) to confirm startup recovery: resumed executions, re-dispatched webhook deliveries, and any bare runs reconciled to Failed are all logged. Finally, expect SDK clients on the old major.minor to log a one-time version-skew warning from health() — upgrade the SDKs at your convenience (same major.minor = same API).


Two distinct cases:

The new binary misbehaves but wrote nothing you need to keep (caught in verification): stop it, reinstall the previous binary, and — because on-disk formats fail closed on newer versions — restore the pre-upgrade state rather than pointing the old binary at state the new one may have touched:

Terminal window
wovyr admin restore /var/backups/wovyr/pre-<date> --yes # verifies the sha256 manifest before writing

For Postgres backends, restore the matching database snapshot from step 1. There is no migrate --down: schema rollback is restore the snapshot, by design (forward-only migrations keep the version ledger unambiguous).

The new version has been live and accepted real traffic: rolling back means losing the writes since the upgrade (restore = the backup’s contents; RPO is your backup cadence — see backup-and-restore.md §5). Prefer rolling forward to a fixed patch release; treat restore-based rollback as the disaster path.


  • Never run an older binary against ~/.wovyr state or a Postgres schema a newer binary has written/migrated — every versioned surface (workflow event envelopes, UI frame schema, refinery schema versions) rejects newer-than-understood data by design. Rollback = old binary plus restored old state, never old binary alone.
  • The single binary serves CLI and server, and both share ~/.wovyr — upgrade them as one unit on a host; don’t run a new CLI against an old server’s state directory on the same machine.
  • SDKs are forward/backward tolerant within the same major.minor; across minors, health() warns and CHANGELOG.md (per SDK) lists what changed.


VersionDateDescription
1.0.02026-07-18RM-AIM-P3 DEP-302: initial end-to-end upgrade/migration runbook (backup → swap → migrate → verify → rollback, per-shape variants)